Reports and
Publications
Florence
Junction TI
Florence
Junction to Superior
Superior
to Globe
Environmental Determination, May
2002
Final Project Assessment, November
2000

Design Update
Newsletter, July 2005
Final Design Concept Report, May 2004
Executive Summary
Chapter 1 - Introduction
Chapter 2 - Traffic and Accident Data
Chapter 3 - AASHTO Controlling Design Criteria
Chapter
4 - Location Analysis
Chapter 5 - Design
Concept Alternatives
Chapter 6 -
Major Design Features
Chapter
7 - Itemized Cost Estimates
Chapter
8 - Implementation Plan
Appendix A - Typical
Sections
Appendix B - Plan and
Profile Sheets for Preferred Alternatives
Appendix C - Plan and
Profile Sheets for Considered Alternatives
Appendix D - Cost
Estimates for Alternatives
Appendix E - Drainage
Culvert/Structure Summaries
Final Environmental Assessment, March 2004
Main Text
Appendix 1:
Biological Opinion
Programmatic Agreement
Correspondence
Appendix 2
Appendix 3
Draft Environmental Assessment, May 2003
Chapter 1 - Introduction
Chapter 2 -
Project Purpose and Need
Chapter
3 - Alternatives
Chapter
4 - Affected Environment and Environmental Impacts
Chapter
5 - Public Involvement/Project Coordination
Appendices
A, B, and C
Appendices
D, E, and F
Appendix
G
Appendices
H, I, and J
Initial Design Concept Report, September 2001
Executive Summary Chapter 1 - Introduction Chapter 2 - Traffic and Accident Data Chapter 3 - AASHTO Controlling Design Criteria Chapter
4 - Location Analysis Chapter 5 - Design
Concept Alternatives
Chapter 6 -
Major Design Features
Chapter
7 - Itemized Cost Estimates
Chapter
8 - Implementation Plan
Initial Feasibility Report, June 1999
Executive Summary Chapter 1 - Introduction Chapter 2 - Traffic and Accident Data Chapter 3 - AASHTO Controlling Design Criteria Chapter 4 - Alternatives Considered Chapter 5 - Major Design Features
Chapter 6 - Environmental Overview
Traffic Report,
March 1999

Final Feasibility Report, October 2004
Executive Summary
Chapter 1 - Introduction
Chapter 2 - Traffic and Accident Data Figures:
1
2
3
4
6
7
Chapter 3 - AASHTO Controlling Design Criteria
Chapter 4 - Alternatives Considered Figures:
1
2
3
4
5
6
7
8
Chapter 5 - Major Design Features
Figures:
1
Chapter 6 - Environmental Overview
Appendix - Plan and
Profile Sheets for Corridor Alternatives
Segment A
Segment B
Segment C
Segment D
Segment E
Initial Feasibility Report, April 2002
Executive Summary Chapter 1 - Introduction Chapter 2 - Traffic and Accident Data
Text
Figures: 1
2
3
4
6
7 Chapter 3 - AASHTO Controlling Design Criteria Chapter 4 - Alternatives Considered
Text
Figures: 1 2-4 5-7 8 9-12
13-16
17-20
21
22-24
25-27 Chapter 5 - Major Design Features
Chapter 6 - Environmental Overview
Traffic Report, December 1999
Text
Tables Figures:
1
2
3
4
5
6
7
8
9 Initial
Drainage Memorandum, August 2000
Drainage Memo Text
Appendices - HEC
Input and Output files, Calculations, Photographs
(NOTE: Files are large)
Appendix A - HEC Input Worksheets
Appendix B - HEC Output Files
Appendix C - Culvert Calculations
Appendix D - Bridge and Channel Calcs
Appendix E - Photographs
Appendix F - Drainage Basin Hydraulics
|